Saturday, May 23, 2015

The solar panels were installed, and it took the better part of 3 days.  

FROM SOUTH SIDE:




These are from the "southish" side.  The third row of panels is actually on the north side of the roof.


FROM NORTH SIDE:




From here you can see the single row of panels on the north side, facing south.  This required a building permit.  The racking is by Schletter and you can see a horizontal row of sheet metal that protect the panels from wind.  



No comments:

Post a Comment